Sunday, June 20, 2010

Inside progress





Here's a few shots from inside the house to show you what's been going on in the interior. Old construction stairs removed on Friday & nice new oak staircase was installed. Rails and landing are still in-work. Air handler & ducting for 2nd floor heating/cooling was installed in the attic. Another similar system will eventually be installed in the crawl space to manage the first floor air. Gas fireplace box installed in first floor 'away-room', with cabinet space & TV to be built-in above it. Starting to fill-in on inside of house :)


1 comment: